Case study

Installation of a platform on columns

Our installation teams erecting the steel frame of a platform using aerial work platforms.

Client
Logistics warehouse
Works
4 weeks
Assembly of the steel structure of a platform on columns
  1. 01

    The need

    Increase the usable floor space of a warehouse while keeping forklift traffic flowing.

  2. 02

    Our solution

    Long-span platform on columns, with a wide grid to limit the number of columns on the ground.

  3. 03

    The result

    Twice the floor space in the area concerned, with no disruption to forklift flows.

A similar project? Request a quote

Solutions used

The solutions in this project

Crane installation of the steel frame of a heavy-duty structure

Heavy-duty mezzanine

Hot-rolled steel structures to carry loaded racking, machines or handling equipment traffic.

Do you have a similar project?

Our engineering office studies your building and proposes the right solution.